Sailing Yabávideo

Bilge pump acrobatics and off-grid wooden boat restoration — Sailing Yabá 184

30 January 2024 · 14 min · 67K views

What this video covers

Ben and the crew install two bilge pumps on the wooden boat Yabá while working in a shipyard.12:24 They mount the pumps to stainless steel through-hulls located approximately 20 centimetres above the waterline to distinguish them from the bronze toilet through-hulls positioned below the waterline.8:44 The installation process involves applying Teflon tape and liquid gasket to elbow joints and hose connectors, then securing the hoses with two hose clamps at each connection point.3:37 To prevent backflow, the crew installs Jabscurt no-return valves on the bilge pump lines.6:35 The work takes place in the engine room and the bow locker, with the boat powered by a 24-volt battery bank while the 220-volt system remains disconnected.5:43 The crew also deploys a tarp over the deck to keep the interior dry during rainy weather.1:36

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue