Sailing SV Delosvídeo

SMASHING Out Projects 💪 (Building Our Own Aluminum Catamaran Pt. 24)

14 de febrero de 2025 · 20 min · 289K visitas

Qué cubre este vídeo

Construction of the custom aluminum catamaran continues with the installation of grey water plumbing, black water tanks, and recessed deck hatches. The crew mounts a grey water pump on existing stringers in the bilge to ensure easy maintenance access.2:36 To accommodate flush-mounted hatches, the team cuts and welds frames into the deck, requiring precise alignment to ensure the glass sits level with the deck surface.5:29 Because the pre-cut holes in the aluminum kit were oversized, the crew welds in filler material before re-cutting the openings to fit the hatch frames.6:01 The team also installs two 80-liter black water tanks in a wet locker, a task that requires precise timing to slide the tanks into position before the final welding of nearby hatch frames restricts access.17:34 Separately, the crew visits a fabrication shop to inspect custom aluminum-framed windows and doors, which feature twin brush seals, gas struts for 95-degree opening, and ceramic edge banding to protect adhesives from UV degradation.11:17

Ver en YouTube

Más de Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85sept 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago 2026

De Sailing SV Delos — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema