Sailing SV Delosvidéo
SMASHING Out Projects 💪 (Building Our Own Aluminum Catamaran Pt. 24)
14 février 2025 · 20 min · 289K vues
Ce que couvre cette vidéo
Construction of the custom aluminum catamaran continues with the installation of grey water plumbing, black water tanks, and recessed deck hatches. The crew mounts a grey water pump on existing stringers in the bilge to ensure easy maintenance access.2:36 To accommodate flush-mounted hatches, the team cuts and welds frames into the deck, requiring precise alignment to ensure the glass sits level with the deck surface.5:29 Because the pre-cut holes in the aluminum kit were oversized, the crew welds in filler material before re-cutting the openings to fit the hatch frames.6:01 The team also installs two 80-liter black water tanks in a wet locker, a task that requires precise timing to slide the tanks into position before the final welding of nearby hatch frames restricts access.17:34 Separately, the crew visits a fabrication shop to inspect custom aluminum-framed windows and doors, which feature twin brush seals, gas struts for 95-degree opening, and ceramic edge banding to protect adhesives from UV degradation.11:17
Plus de vidéos de Sailing SV Delos
De Sailing SV Delos — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



