Sailing SV Delosvídeo

SMASHING Out Projects 💪 (Building Our Own Aluminum Catamaran Pt. 24)

14 de fevereiro de 2025 · 20 min · 289K visualizações

O que este vídeo aborda

Construction of the custom aluminum catamaran continues with the installation of grey water plumbing, black water tanks, and recessed deck hatches. The crew mounts a grey water pump on existing stringers in the bilge to ensure easy maintenance access.2:36 To accommodate flush-mounted hatches, the team cuts and welds frames into the deck, requiring precise alignment to ensure the glass sits level with the deck surface.5:29 Because the pre-cut holes in the aluminum kit were oversized, the crew welds in filler material before re-cutting the openings to fit the hatch frames.6:01 The team also installs two 80-liter black water tanks in a wet locker, a task that requires precise timing to slide the tanks into position before the final welding of nearby hatch frames restricts access.17:34 Separately, the crew visits a fabrication shop to inspect custom aluminum-framed windows and doors, which feature twin brush seals, gas struts for 95-degree opening, and ceramic edge banding to protect adhesives from UV degradation.11:17

Assistir no YouTube

Mais de Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85set. de 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84ago. de 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83ago. de 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82ago. de 2026

De Sailing SV Delos — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema