Sailing SV Delosvideo

SMASHING Out Projects đŸ’Ș (Building Our Own Aluminum Catamaran Pt. 24)

14. februar 2025 · 20 min · 289K visninger

Hva denne videoen dekker

Construction of the custom aluminum catamaran continues with the installation of grey water plumbing, black water tanks, and recessed deck hatches. The crew mounts a grey water pump on existing stringers in the bilge to ensure easy maintenance access.2:36 To accommodate flush-mounted hatches, the team cuts and welds frames into the deck, requiring precise alignment to ensure the glass sits level with the deck surface.5:29 Because the pre-cut holes in the aluminum kit were oversized, the crew welds in filler material before re-cutting the openings to fit the hatch frames.6:01 The team also installs two 80-liter black water tanks in a wet locker, a task that requires precise timing to slide the tanks into position before the final welding of nearby hatch frames restricts access.17:34 Separately, the crew visits a fabrication shop to inspect custom aluminum-framed windows and doors, which feature twin brush seals, gas struts for 95-degree opening, and ceramic edge banding to protect adhesives from UV degradation.11:17

Se pÄ YouTube

Mer fra Sailing SV Delos

Fit or FAIL đŸ«Ł Building Our Own Aluminum Catamaran Pt. 85sep. 2026This Is Where It Gets INTERESTING
Aluminum Catamaran Build Pt. 84aug. 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83aug. 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82aug. 2026

Fra Sailing SV Delos – se kanalens bĂ„t, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flĂ„tens beste funn – Ăžyeblikkene, bĂ„tene og historiene som er verdt din seertid. Skriv inn din egen adresse for Ă„ fĂ„ din egen kopi.

Rapporter et problem