Sailing SV Delosvideo

SMASHING Out Projects 💪 (Building Our Own Aluminum Catamaran Pt. 24)

February 14, 2025 · 20 min · 289K views

What this video covers

Construction of the custom aluminum catamaran continues with the installation of grey water plumbing, black water tanks, and recessed deck hatches. The crew mounts a grey water pump on existing stringers in the bilge to ensure easy maintenance access.2:36 To accommodate flush-mounted hatches, the team cuts and welds frames into the deck, requiring precise alignment to ensure the glass sits level with the deck surface.5:29 Because the pre-cut holes in the aluminum kit were oversized, the crew welds in filler material before re-cutting the openings to fit the hatch frames.6:01 The team also installs two 80-liter black water tanks in a wet locker, a task that requires precise timing to slide the tanks into position before the final welding of nearby hatch frames restricts access.17:34 Separately, the crew visits a fabrication shop to inspect custom aluminum-framed windows and doors, which feature twin brush seals, gas struts for 95-degree opening, and ceramic edge banding to protect adhesives from UV degradation.11:17

Watch on YouTube

More from Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sep 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue