MJ Sailingvídeo
Container to Cabin Top: Time Lapse of Building Our Catamaran's Hull & Bulkheads (MJ Sailing - Ep 348
23 de noviembre de 2024 · 17 min · 83K visitas
Qué cubre este vídeo
Matt and Jessica are currently fairing, priming, and painting the interior surfaces of their custom-built catamaran.0:08 This phase follows a nine-month construction period dedicated to building the hull and bulkheads, which enclosed the vessel.0:53 The pair plans to transition to plumbing and electrical installations once the interior painting is complete.0:30 The build process is documented through a time-lapse covering the initial structural assembly.0:46 Additionally, the owners utilize a Jackery Explorer 300 Plus portable power station to provide electricity for tools and devices while working inside the boat.8:20
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



