MJ Sailingvídeo

Container to Cabin Top: Time Lapse of Building Our Catamaran's Hull & Bulkheads (MJ Sailing - Ep 348

23 de novembro de 2024 · 17 min · 83K visualizações

O que este vídeo aborda

Matt and Jessica are currently fairing, priming, and painting the interior surfaces of their custom-built catamaran.0:08 This phase follows a nine-month construction period dedicated to building the hull and bulkheads, which enclosed the vessel.0:53 The pair plans to transition to plumbing and electrical installations once the interior painting is complete.0:30 The build process is documented through a time-lapse covering the initial structural assembly.0:46 Additionally, the owners utilize a Jackery Explorer 300 Plus portable power station to provide electricity for tools and devices while working inside the boat.8:20

Ver no YouTube

Mais de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)08/2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)07/2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)06/2026Preparing Our Catamaran for Paint—and Me for Captain's School06/2026

De MJ Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema