MJ Sailingvideo

Container to Cabin Top: Time Lapse of Building Our Catamaran's Hull & Bulkheads (MJ Sailing - Ep 348

November 23, 2024 · 17 min · 83K views

What this video covers

Matt and Jessica are currently fairing, priming, and painting the interior surfaces of their custom-built catamaran.0:08 This phase follows a nine-month construction period dedicated to building the hull and bulkheads, which enclosed the vessel.0:53 The pair plans to transition to plumbing and electrical installations once the interior painting is complete.0:30 The build process is documented through a time-lapse covering the initial structural assembly.0:46 Additionally, the owners utilize a Jackery Explorer 300 Plus portable power station to provide electricity for tools and devices while working inside the boat.8:20

Watch on YouTube

More from MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Aug 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026

From MJ Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue