MJ Sailingvideo

Container to Cabin Top: Time Lapse of Building Our Catamaran's Hull & Bulkheads (MJ Sailing - Ep 348

23 de noviembre de 2024 · 17 min · 83K vistas

¿Qué cubre este video?

Matt and Jessica are currently fairing, priming, and painting the interior surfaces of their custom-built catamaran.0:08 This phase follows a nine-month construction period dedicated to building the hull and bulkheads, which enclosed the vessel.0:53 The pair plans to transition to plumbing and electrical installations once the interior painting is complete.0:30 The build process is documented through a time-lapse covering the initial structural assembly.0:46 Additionally, the owners utilize a Jackery Explorer 300 Plus portable power station to provide electricity for tools and devices while working inside the boat.8:20

Ver en YouTube

Más de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljun 2026

De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema