MJ Sailingvídeo
Container to Cabin Top: Time Lapse of Building Our Catamaran's Hull & Bulkheads (MJ Sailing - Ep 348
23 de novembro de 2024 · 17 min · 83K visualizações
O que este vídeo aborda
Matt and Jessica are currently fairing, priming, and painting the interior surfaces of their custom-built catamaran.0:08 This phase follows a nine-month construction period dedicated to building the hull and bulkheads, which enclosed the vessel.0:53 The pair plans to transition to plumbing and electrical installations once the interior painting is complete.0:30 The build process is documented through a time-lapse covering the initial structural assembly.0:46 Additionally, the owners utilize a Jackery Explorer 300 Plus portable power station to provide electricity for tools and devices while working inside the boat.8:20
Mais de MJ Sailing
De MJ Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



