Sven Yrvindvídeo

21 Jan 2024 First carbon spar + work on mastholders

21 de enero de 2024 · 2 min · 2K visitas · Loftahammar

Qué cubre este vídeo

Sven Yrvind collaborates with sailmaker Ulf from Sail Center in Loftahammar to fabricate a new carbon fiber boom for his boat.0:23 The construction process involves laminating the top of the spar to ensure structural strength in all directions.1:35 Yrvind successfully completes the lamination of three mast holders, each weighing approximately 14 kilograms, using an epoxy injection technique. He avoids using extra ropes or secondary hardware during the layup, noting the process proceeded efficiently. The mast holders feature a bottom layer designed to embed them into the foam core before the final drilling of drainage holes.0:47 These components represent a significant step in the ongoing assembly of the vessel's rigging.

Ver en YouTube

Más de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.oct 2026Nervously Cutting the Divinycell Sheets.oct 2026Trying to Get the Sheerline Right.oct 2026More molds up.oct 2026

De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema