Sven Yrvindvideo

21 Jan 2024 First carbon spar + work on mastholders

January 21, 2024 · 2 min · 2K views · Loftahammar

What this video covers

Sven Yrvind collaborates with sailmaker Ulf from Sail Center in Loftahammar to fabricate a new carbon fiber boom for his boat.0:23 The construction process involves laminating the top of the spar to ensure structural strength in all directions.1:35 Yrvind successfully completes the lamination of three mast holders, each weighing approximately 14 kilograms, using an epoxy injection technique. He avoids using extra ropes or secondary hardware during the layup, noting the process proceeded efficiently. The mast holders feature a bottom layer designed to embed them into the foam core before the final drilling of drainage holes.0:47 These components represent a significant step in the ongoing assembly of the vessel's rigging.

Watch on YouTube

More from Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.Oct 2026Nervously Cutting the Divinycell Sheets.Oct 2026Trying to Get the Sheerline Right.Oct 2026More molds up.Oct 2026

From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue