Sven Yrvindvídeo

21 Jan 2024 First carbon spar + work on mastholders

21 de janeiro de 2024 · 2 min · 2K visualizações · Loftahammar

O que este vídeo aborda

Sven Yrvind collaborates with sailmaker Ulf from Sail Center in Loftahammar to fabricate a new carbon fiber boom for his boat.0:23 The construction process involves laminating the top of the spar to ensure structural strength in all directions.1:35 Yrvind successfully completes the lamination of three mast holders, each weighing approximately 14 kilograms, using an epoxy injection technique. He avoids using extra ropes or secondary hardware during the layup, noting the process proceeded efficiently. The mast holders feature a bottom layer designed to embed them into the foam core before the final drilling of drainage holes.0:47 These components represent a significant step in the ongoing assembly of the vessel's rigging.

Ver no YouTube

Mais de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.10/2026Nervously Cutting the Divinycell Sheets.10/2026Trying to Get the Sheerline Right.10/2026More molds up.10/2026

De Sven Yrvind — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema