Sven Yrvindvideo

21 Jan 2024 First carbon spar + work on mastholders

21 gennaio 2024 · 2 min · 2K visualizzazioni · Loftahammar

Cosa tratta questo video

Sven Yrvind collaborates with sailmaker Ulf from Sail Center in Loftahammar to fabricate a new carbon fiber boom for his boat.0:23 The construction process involves laminating the top of the spar to ensure structural strength in all directions.1:35 Yrvind successfully completes the lamination of three mast holders, each weighing approximately 14 kilograms, using an epoxy injection technique. He avoids using extra ropes or secondary hardware during the layup, noting the process proceeded efficiently. The mast holders feature a bottom layer designed to embed them into the foam core before the final drilling of drainage holes.0:47 These components represent a significant step in the ongoing assembly of the vessel's rigging.

Guarda su YouTube

Altro da Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.ott 2026Nervously Cutting the Divinycell Sheets.ott 2026Trying to Get the Sheerline Right.ott 2026More molds up.ott 2026

Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema