Sven Yrvindvídeo
15 Sep 2023 Draining pipes for overflow tanks
15 de septiembre de 2023 · 4 min · 3K visitas · Laxå
Qué cubre este vídeo
Sven Yrvind installs drain pipes for the overflow tanks on his boat while it rests on its side.0:43 He drills a 25mm pilot hole through the hull using a long spiral drill bit, then manually enlarges the opening to accommodate a 30mm pipe.2:08 To ensure the pipe fits the hull curvature, he calculates the necessary dimensions using a formula involving the diameter, pi, and the square root of two.2:55 The piping system connects the forward and aft overflow tanks, with the pipes exiting through the bottom of the hull.3:13 He selects a smaller diameter pipe to minimize hydrodynamic resistance while the boat moves through the water.1:02 The installation process involves gluing the components in place and cutting the pipe ends flush with the hull surface.3:57
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



