Sven Yrvindvideo

15 Sep 2023 Draining pipes for overflow tanks

15 settembre 2023 · 4 min · 3K visualizzazioni · Laxå

Cosa tratta questo video

Sven Yrvind installs drain pipes for the overflow tanks on his boat while it rests on its side.0:43 He drills a 25mm pilot hole through the hull using a long spiral drill bit, then manually enlarges the opening to accommodate a 30mm pipe.2:08 To ensure the pipe fits the hull curvature, he calculates the necessary dimensions using a formula involving the diameter, pi, and the square root of two.2:55 The piping system connects the forward and aft overflow tanks, with the pipes exiting through the bottom of the hull.3:13 He selects a smaller diameter pipe to minimize hydrodynamic resistance while the boat moves through the water.1:02 The installation process involves gluing the components in place and cutting the pipe ends flush with the hull surface.3:57

Guarda su YouTube

Altro da Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.ott 2026Nervously Cutting the Divinycell Sheets.ott 2026Trying to Get the Sheerline Right.ott 2026More molds up.ott 2026

Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema