Sven Yrvindvídeo

15 Sep 2023 Draining pipes for overflow tanks

15 de setembro de 2023 · 4 min · 3K visualizações · Laxå

O que este vídeo aborda

Sven Yrvind installs drain pipes for the overflow tanks on his boat while it rests on its side.0:43 He drills a 25mm pilot hole through the hull using a long spiral drill bit, then manually enlarges the opening to accommodate a 30mm pipe.2:08 To ensure the pipe fits the hull curvature, he calculates the necessary dimensions using a formula involving the diameter, pi, and the square root of two.2:55 The piping system connects the forward and aft overflow tanks, with the pipes exiting through the bottom of the hull.3:13 He selects a smaller diameter pipe to minimize hydrodynamic resistance while the boat moves through the water.1:02 The installation process involves gluing the components in place and cutting the pipe ends flush with the hull surface.3:57

Assistir no YouTube

Mais de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.out. de 2026Nervously Cutting the Divinycell Sheets.out. de 2026Trying to Get the Sheerline Right.out. de 2026More molds up.out. de 2026

De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema