Sven Yrvindvideo

15 Sep 2023 Draining pipes for overflow tanks

15 September 2023 · 4 min · 3K views · Laxå

What this video covers

Sven Yrvind installs drain pipes for the overflow tanks on his boat while it rests on its side.0:43 He drills a 25mm pilot hole through the hull using a long spiral drill bit, then manually enlarges the opening to accommodate a 30mm pipe.2:08 To ensure the pipe fits the hull curvature, he calculates the necessary dimensions using a formula involving the diameter, pi, and the square root of two.2:55 The piping system connects the forward and aft overflow tanks, with the pipes exiting through the bottom of the hull.3:13 He selects a smaller diameter pipe to minimize hydrodynamic resistance while the boat moves through the water.1:02 The installation process involves gluing the components in place and cutting the pipe ends flush with the hull surface.3:57

Watch on YouTube

More from Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.Oct 2026Nervously Cutting the Divinycell Sheets.Oct 2026Trying to Get the Sheerline Right.Oct 2026More molds up.Oct 2026

From Sven Yrvind — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue