Sailing Zataravídeo
She Got a MAKEOVER! Catamaran Haul Out, Bottom Job, Antifoul (Ep 156)
27 de mayo de 2021 · 16 min · 295K visitas
Qué cubre este vídeo
The crew of the catamaran Zatara performs a comprehensive bottom job and mechanical overhaul while hauled out in Perth. The project includes stripping old anti-fouling paint, sanding the fiberglass hulls to the gel coat, and applying two coats of new anti-fouling paint.1:59 To address previous issues with rope cutters, the crew replaces the starboard prop shaft with a new unit fabricated by ProMarineWA, allowing for the installation of a rope cutter to protect against lobster traps.7:08 They also replace the brass cutlass bearings with fiber versions and install new zincs on the props, shafts, and keel coolers to mitigate electrolysis.10:08 Additional maintenance includes applying PropSpeed to the propellers and LightSpeed to underwater lights and transducers.15:15 The crew completes minor gel coat repairs and applies new navy blue pinstripes to the hulls before preparing to relaunch.15:44
Más de Sailing Zatara
De Sailing Zatara — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



