Sailing Zataravidéo
She Got a MAKEOVER! Catamaran Haul Out, Bottom Job, Antifoul (Ep 156)
27 mai 2021 · 16 min · 295K vues
Ce que couvre cette vidéo
The crew of the catamaran Zatara performs a comprehensive bottom job and mechanical overhaul while hauled out in Perth. The project includes stripping old anti-fouling paint, sanding the fiberglass hulls to the gel coat, and applying two coats of new anti-fouling paint.1:59 To address previous issues with rope cutters, the crew replaces the starboard prop shaft with a new unit fabricated by ProMarineWA, allowing for the installation of a rope cutter to protect against lobster traps.7:08 They also replace the brass cutlass bearings with fiber versions and install new zincs on the props, shafts, and keel coolers to mitigate electrolysis.10:08 Additional maintenance includes applying PropSpeed to the propellers and LightSpeed to underwater lights and transducers.15:15 The crew completes minor gel coat repairs and applies new navy blue pinstripes to the hulls before preparing to relaunch.15:44
Plus de vidéos de Sailing Zatara
De Sailing Zatara — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



