Sailing Zataravideo

She Got a MAKEOVER! Catamaran Haul Out, Bottom Job, Antifoul (Ep 156)

27 May 2021 · 16 min · 295K views

What this video covers

The crew of the catamaran Zatara performs a comprehensive bottom job and mechanical overhaul while hauled out in Perth. The project includes stripping old anti-fouling paint, sanding the fiberglass hulls to the gel coat, and applying two coats of new anti-fouling paint.1:59 To address previous issues with rope cutters, the crew replaces the starboard prop shaft with a new unit fabricated by ProMarineWA, allowing for the installation of a rope cutter to protect against lobster traps.7:08 They also replace the brass cutlass bearings with fiber versions and install new zincs on the props, shafts, and keel coolers to mitigate electrolysis.10:08 Additional maintenance includes applying PropSpeed to the propellers and LightSpeed to underwater lights and transducers.15:15 The crew completes minor gel coat repairs and applies new navy blue pinstripes to the hulls before preparing to relaunch.15:44

Watch on YouTube

More from Sailing Zatara

From One Extreme to the Other!Aug 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)Aug 2026Why We AREN'T Afraid of Sharks!Jul 2026We (almost) Bought an Island! 🏝️Jul 2026

From Sailing Zatara — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue