Sailing Zataravideo

She Got a MAKEOVER! Catamaran Haul Out, Bottom Job, Antifoul (Ep 156)

27 maggio 2021 · 16 min · 295K visualizzazioni

Cosa tratta questo video

The crew of the catamaran Zatara performs a comprehensive bottom job and mechanical overhaul while hauled out in Perth. The project includes stripping old anti-fouling paint, sanding the fiberglass hulls to the gel coat, and applying two coats of new anti-fouling paint.1:59 To address previous issues with rope cutters, the crew replaces the starboard prop shaft with a new unit fabricated by ProMarineWA, allowing for the installation of a rope cutter to protect against lobster traps.7:08 They also replace the brass cutlass bearings with fiber versions and install new zincs on the props, shafts, and keel coolers to mitigate electrolysis.10:08 Additional maintenance includes applying PropSpeed to the propellers and LightSpeed to underwater lights and transducers.15:15 The crew completes minor gel coat repairs and applies new navy blue pinstripes to the hulls before preparing to relaunch.15:44

Guarda su YouTube

Altro da Sailing Zatara

From One Extreme to the Other!ago 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)ago 2026Why We AREN'T Afraid of Sharks!lug 2026We (almost) Bought an Island! 🏝️lug 2026

Da Sailing Zatara — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema