Sailing Zataravídeo

She Got a MAKEOVER! Catamaran Haul Out, Bottom Job, Antifoul (Ep 156)

27 de maio de 2021 · 16 min · 295K visualizações

O que este vídeo aborda

The crew of the catamaran Zatara performs a comprehensive bottom job and mechanical overhaul while hauled out in Perth. The project includes stripping old anti-fouling paint, sanding the fiberglass hulls to the gel coat, and applying two coats of new anti-fouling paint.1:59 To address previous issues with rope cutters, the crew replaces the starboard prop shaft with a new unit fabricated by ProMarineWA, allowing for the installation of a rope cutter to protect against lobster traps.7:08 They also replace the brass cutlass bearings with fiber versions and install new zincs on the props, shafts, and keel coolers to mitigate electrolysis.10:08 Additional maintenance includes applying PropSpeed to the propellers and LightSpeed to underwater lights and transducers.15:15 The crew completes minor gel coat repairs and applies new navy blue pinstripes to the hulls before preparing to relaunch.15:44

Assistir no YouTube

Mais de Sailing Zatara

From One Extreme to the Other!ago. de 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)ago. de 2026Why We AREN'T Afraid of Sharks!jul. de 2026We (almost) Bought an Island! 🏝️jul. de 2026

De Sailing Zatara — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema