Entre Terras e Maresvídeo

FINALLY! We finished the ceiling finish of the Pilot House T1 ep140

20 de octubre de 2024 · 26 min · 1K visitas

Qué cubre este vídeo

The crew completes the ceiling finish on the pilot house, installing removable panels to allow future access to deck hardware such as stoppers and winches.25:10 They also finalize the installation of a manual adjustable table pedestal, which converts the seating area into a double berth.22:03 To secure the pedestal base, the team laminates three layers of 450-gram fiberglass mat, providing a solid foundation for the mounting screws.20:16

Separately, the crew refurbishes several portlights by replacing the original rubber gaskets with a similar profile sourced from a rubber supply shop in Osasco.4:36 They use contact cement to bond the new gaskets, ensuring a tight fit to prevent water ingress.6:02 For structural bonding of wood components to fiberglass, the team employs a hybrid method using both epoxy and polyester resin, applying a preliminary resin coat to the wood to ensure proper adhesion before bonding.13:17 The project concludes with the ceiling panels and table mechanism fully installed and leveled.25:00

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema