FINALLY! We finished the ceiling finish of the Pilot House T1 ep140
20 octobre 2024 · 26 min · 1K vues
Ce que couvre cette vidéo
The crew completes the ceiling finish on the pilot house, installing removable panels to allow future access to deck hardware such as stoppers and winches.25:10 They also finalize the installation of a manual adjustable table pedestal, which converts the seating area into a double berth.22:03 To secure the pedestal base, the team laminates three layers of 450-gram fiberglass mat, providing a solid foundation for the mounting screws.20:16
Separately, the crew refurbishes several portlights by replacing the original rubber gaskets with a similar profile sourced from a rubber supply shop in Osasco.4:36 They use contact cement to bond the new gaskets, ensuring a tight fit to prevent water ingress.6:02 For structural bonding of wood components to fiberglass, the team employs a hybrid method using both epoxy and polyester resin, applying a preliminary resin coat to the wood to ensure proper adhesion before bonding.13:17 The project concludes with the ceiling panels and table mechanism fully installed and leveled.25:00
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.