Entre Terras e Maresvideo

FINALLY! We finished the ceiling finish of the Pilot House T1 ep140

October 20, 2024 · 26 min · 1K views

What this video covers

The crew completes the ceiling finish on the pilot house, installing removable panels to allow future access to deck hardware such as stoppers and winches.25:10 They also finalize the installation of a manual adjustable table pedestal, which converts the seating area into a double berth.22:03 To secure the pedestal base, the team laminates three layers of 450-gram fiberglass mat, providing a solid foundation for the mounting screws.20:16

Separately, the crew refurbishes several portlights by replacing the original rubber gaskets with a similar profile sourced from a rubber supply shop in Osasco.4:36 They use contact cement to bond the new gaskets, ensuring a tight fit to prevent water ingress.6:02 For structural bonding of wood components to fiberglass, the team employs a hybrid method using both epoxy and polyester resin, applying a preliminary resin coat to the wood to ensure proper adhesion before bonding.13:17 The project concludes with the ceiling panels and table mechanism fully installed and leveled.25:00

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue