Entre Terras e Maresvídeo
FINALLY! We finished the ceiling finish of the Pilot House T1 ep140
20 de outubro de 2024 · 26 min · 1K visualizações
O que este vídeo aborda
The crew completes the ceiling finish on the pilot house, installing removable panels to allow future access to deck hardware such as stoppers and winches.25:10 They also finalize the installation of a manual adjustable table pedestal, which converts the seating area into a double berth.22:03 To secure the pedestal base, the team laminates three layers of 450-gram fiberglass mat, providing a solid foundation for the mounting screws.20:16
Separately, the crew refurbishes several portlights by replacing the original rubber gaskets with a similar profile sourced from a rubber supply shop in Osasco.4:36 They use contact cement to bond the new gaskets, ensuring a tight fit to prevent water ingress.6:02 For structural bonding of wood components to fiberglass, the team employs a hybrid method using both epoxy and polyester resin, applying a preliminary resin coat to the wood to ensure proper adhesion before bonding.13:17 The project concludes with the ceiling panels and table mechanism fully installed and leveled.25:00
Mais de Entre Terras e Mares
De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



