Catamaran Mistertong vídeo

#206 We're already starting the second leg

4 de abril de 2026 · 46 min · 7K visitas

Woman works hull under tarp, tools scattered around boat

Qué cubre este vídeo

Djé and Nad continue structural repairs on their Outremer catamaran, focusing on the main beam and identifying extensive rot under the nacelle.13:56 The crew reinforces the beam using foam filler, fiberglass, and epoxy, while installing horizontal access hatches to reach internal mounting bolts for the bow roller.1:41 They also fabricate custom composite hinges for the roof, using a stainless steel rod as a mold to ensure precise alignment.21:09 During the inspection of the nacelle, the pair discovers significant wood rot that requires cutting away damaged sections with an angle grinder for future replacement.23:59 Despite the physical toll of the ongoing restoration and the discovery of additional structural damage, the owners maintain their schedule to complete the work, including the application of Coppercoat antifouling.31:06 The project remains a long-term effort, with the crew prioritizing exposed exterior work during dry weather and reserving interior repairs for rainy days.28:30

Ver en YouTube

Más de Catamaran Mistertong

#245 The break didn't last very long…ago 2026#244 Worrying: Our boats held hostage in the Caribbeanago 2026#243 Locked in until when???ago 2026#242 The engine is no longer spitting!!!ago 2026

De Catamaran Mistertong — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema