Catamaran Mistertong vidéo
#206 We're already starting the second leg
4 avril 2026 · 46 min · 7K vues
Woman works hull under tarp, tools scattered around boat
Ce que couvre cette vidéo
Djé and Nad continue structural repairs on their Outremer catamaran, focusing on the main beam and identifying extensive rot under the nacelle.13:56 The crew reinforces the beam using foam filler, fiberglass, and epoxy, while installing horizontal access hatches to reach internal mounting bolts for the bow roller.1:41 They also fabricate custom composite hinges for the roof, using a stainless steel rod as a mold to ensure precise alignment.21:09 During the inspection of the nacelle, the pair discovers significant wood rot that requires cutting away damaged sections with an angle grinder for future replacement.23:59 Despite the physical toll of the ongoing restoration and the discovery of additional structural damage, the owners maintain their schedule to complete the work, including the application of Coppercoat antifouling.31:06 The project remains a long-term effort, with the crew prioritizing exposed exterior work during dry weather and reserving interior repairs for rainy days.28:30
Plus de vidéos de Catamaran Mistertong
De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



