Catamaran Mistertong video

#206 We're already starting the second leg

4. april 2026 · 46 min · 7K visninger

Woman works hull under tarp, tools scattered around boat

Hva denne videoen dekker

Djé and Nad continue structural repairs on their Outremer catamaran, focusing on the main beam and identifying extensive rot under the nacelle.13:56 The crew reinforces the beam using foam filler, fiberglass, and epoxy, while installing horizontal access hatches to reach internal mounting bolts for the bow roller.1:41 They also fabricate custom composite hinges for the roof, using a stainless steel rod as a mold to ensure precise alignment.21:09 During the inspection of the nacelle, the pair discovers significant wood rot that requires cutting away damaged sections with an angle grinder for future replacement.23:59 Despite the physical toll of the ongoing restoration and the discovery of additional structural damage, the owners maintain their schedule to complete the work, including the application of Coppercoat antifouling.31:06 The project remains a long-term effort, with the crew prioritizing exposed exterior work during dry weather and reserving interior repairs for rainy days.28:30

Se på YouTube

Mer fra Catamaran Mistertong

#245 The break didn't last very long…aug. 2026#244 Worrying: Our boats held hostage in the Caribbeanaug. 2026#243 Locked in until when???aug. 2026#242 The engine is no longer spitting!!!aug. 2026

Fra Catamaran Mistertong – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem