Catamaran Mistertong video
#206 We're already starting the second leg
4 aprile 2026 · 46 min · 7K visualizzazioni
Woman works hull under tarp, tools scattered around boat
Cosa tratta questo video
Djé and Nad continue structural repairs on their Outremer catamaran, focusing on the main beam and identifying extensive rot under the nacelle.13:56 The crew reinforces the beam using foam filler, fiberglass, and epoxy, while installing horizontal access hatches to reach internal mounting bolts for the bow roller.1:41 They also fabricate custom composite hinges for the roof, using a stainless steel rod as a mold to ensure precise alignment.21:09 During the inspection of the nacelle, the pair discovers significant wood rot that requires cutting away damaged sections with an angle grinder for future replacement.23:59 Despite the physical toll of the ongoing restoration and the discovery of additional structural damage, the owners maintain their schedule to complete the work, including the application of Coppercoat antifouling.31:06 The project remains a long-term effort, with the crew prioritizing exposed exterior work during dry weather and reserving interior repairs for rainy days.28:30
Altro da Catamaran Mistertong
Da Catamaran Mistertong — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



