Catamaran Mistertong vídeo

#206 We're already starting the second leg

4 de abril de 2026 · 46 min · 7K visualizações

Woman works hull under tarp, tools scattered around boat

O que este vídeo aborda

Djé and Nad continue structural repairs on their Outremer catamaran, focusing on the main beam and identifying extensive rot under the nacelle.13:56 The crew reinforces the beam using foam filler, fiberglass, and epoxy, while installing horizontal access hatches to reach internal mounting bolts for the bow roller.1:41 They also fabricate custom composite hinges for the roof, using a stainless steel rod as a mold to ensure precise alignment.21:09 During the inspection of the nacelle, the pair discovers significant wood rot that requires cutting away damaged sections with an angle grinder for future replacement.23:59 Despite the physical toll of the ongoing restoration and the discovery of additional structural damage, the owners maintain their schedule to complete the work, including the application of Coppercoat antifouling.31:06 The project remains a long-term effort, with the crew prioritizing exposed exterior work during dry weather and reserving interior repairs for rainy days.28:30

Assistir no YouTube

Mais de Catamaran Mistertong

#245 The break didn't last very long…ago. de 2026#244 Worrying: Our boats held hostage in the Caribbeanago. de 2026#243 Locked in until when???ago. de 2026#242 The engine is no longer spitting!!!ago. de 2026

De Catamaran Mistertong — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema