Sailing Magic Carpetvidéo

How To Beautify This Boat

29 mars 2024 · 25 min · 84K vues

Ce que couvre cette vidéo

The refit of a Cape George Cutter 36 involves multiple structural and aesthetic upgrades, including the installation of a new cutlass bearing, bowsprit modifications, and the mounting of a teak cabin-top eyebrow. To secure the cutlass bearing, the crew glues the component into the stern tube with epoxy after sanding the interior to account for play.7:21 The bowsprit rebuild includes inserting fiberglass tubes into bolt holes to prevent water ingress and leveling the deck-seating area to ensure a flush fit for a new teak base plate.11:39

Engine work focuses on installing an Aquadrive constant velocity joint system, which uses a thrust bulkhead to isolate the engine from propeller-shaft forces.4:51 The crew uses a template to determine the bulkhead's position and plans to fabricate the final piece from aluminum.15:17 To mount the teak eyebrow without drilling into the new fiberglass cabin top, the crew glues T-nuts to the cabin sides to provide temporary mechanical fastening while the Sikaflex adhesive cures.19:04

Regarder sur YouTube

Bateaux dans cette vidéo

Cape GEORGE 38Leur bateau

Plus de vidéos de Sailing Magic Carpet

A Mysterious Presence on this Northern Islandsept. 2026Sailing Northern Canada | Alone and at Peacesept. 2026Sailing Northern Canada | Alone on a Long Summers Daysept. 2026Sailing Northern Canada | Fishing, Beachcombing.août 2026

De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème