Acorn To Arabellavidéo
Acorn to Arabella - Episode 127 - Bolting Breasthooks, Starting the Shelf, & Ben Moves to MA
4 septembre 2020 · 18 min · 136K vues · Worcester, Massachusetts
Ce que couvre cette vidéo
Steve and guest builder Bob Emster install the stem and stern breasthooks on the wooden vessel *Arabella*.0:36 The team fits the breasthooks, applies shellac to all faying surfaces, and beds the components in Dolphinite before bolting them into the hull with 5/8-inch bronze fasteners.5:01 To ensure a tight fit during installation, they use a temporary 5/8-inch steel rod to pull the blocks against the stem before drilling the final port-to-starboard fastener holes.7:55 After securing the breasthooks, the crew begins fabricating the locust beam shelf.11:09 They use a cedar board to create a rough pattern for the shelf, employing plywood fingers to spile the shape against the frames.12:25 Upon discovering that the available locust stock lacks the necessary length and quality for a single-piece shelf, they decide to install the shelf in four sections to preserve the best timber for the future covering board.13:42
Plus de vidéos de Acorn To Arabella
De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



