Entre Terras e Maresvidéo
We finally fixed the tunnel for the Patre 1 T1 axis. ep 136
15 septembre 2024 · 35 min · 1K vues
Ce que couvre cette vidéo
The owner of a custom boat project installs and laminates a stainless steel shaft tunnel to house the propeller shaft. After determining the optimal shaft angle between 9.5 and 10.9 degrees to ensure proper alignment with the engine and propeller clearance, the team fabricates a structural support for the tunnel.6:26 This support, which functions similarly to a skeg, is reinforced by welding stainless steel plates to create an I-beam profile, minimizing potential vibration.18:09 The installation process involves securing the tunnel with stainless steel bolts, followed by extensive fiberglass lamination using roving, 800-gram woven fabric, and 450-gram mat.30:45 To build volume and structural integrity, the team uses a mixture of resin and chopped fiberglass powder for fillets and filling gaps before applying multiple layers of structural lamination to the hull.29:51 The project concludes with the tunnel fully anchored and prepared for final heavy-duty structural lamination to ensure long-term durability.34:28
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



