Entre Terras e Maresvideo

We finally fixed the tunnel for the Patre 1 T1 axis. ep 136

15 September 2024 · 35 min · 1K views

What this video covers

The owner of a custom boat project installs and laminates a stainless steel shaft tunnel to house the propeller shaft. After determining the optimal shaft angle between 9.5 and 10.9 degrees to ensure proper alignment with the engine and propeller clearance, the team fabricates a structural support for the tunnel.6:26 This support, which functions similarly to a skeg, is reinforced by welding stainless steel plates to create an I-beam profile, minimizing potential vibration.18:09 The installation process involves securing the tunnel with stainless steel bolts, followed by extensive fiberglass lamination using roving, 800-gram woven fabric, and 450-gram mat.30:45 To build volume and structural integrity, the team uses a mixture of resin and chopped fiberglass powder for fillets and filling gaps before applying multiple layers of structural lamination to the hull.29:51 The project concludes with the tunnel fully anchored and prepared for final heavy-duty structural lamination to ensure long-term durability.34:28

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue