Sailing Suriavidéo
Yanmar SD50 Saildrive Maintenance & Assembly DIY
22 janvier 2024 · 29 min · 4K vues
Ce que couvre cette vidéo
The owner of a Lagoon 410 S2 performs a DIY maintenance overhaul on two Yanmar SD50 saildrives.0:03 The process involves removing the propeller and the bearing housing to inspect and replace the radial shaft seals (simmerrings) and O-rings.1:22 After draining the saildrive oil, the technician uses a knife blade and flat-head screwdrivers to carefully pry the bearing housing from the saildrive body, taking care not to damage the aluminum flange.3:40 The shaft is removed to inspect the gear teeth and bearings, which show no signs of wear.8:43 To address calcification and wear grooves on the shaft where the seals seat, the technician shifts the position of the new seals by approximately 2 millimeters to ensure they ride on an undamaged surface.9:55 New Viton-material seals are installed back-to-back, with the open sides facing the medium they are intended to seal—water on the outside and oil on the inside.18:49 The technician uses a custom-cut PE spacer to achieve the desired seal depth and applies marine-grade winch grease to the assembly.16:50
Bateaux dans cette vidéo
Plus de vidéos de Sailing Suria
De Sailing Suria — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



