Entre Terras e Maresvideo

WE COMPLETED THE BED AND CABINET STRUCTURE FOR THE BOW CABIN T1 ep158

16 marzo 2025 · 25 min · 419 visualizzazioni

Cosa tratta questo video

Edgar and Sâmia continue the interior refit of the forward cabin, focusing on the structural framing for a bed and storage lockers.0:06 The process involves cutting and fitting wooden bulkheads, which are first joined with epoxy and then permanently laminated to the hull using polyester resin.5:23 To ensure a strong bond between the wood and the polyester-coated hull, the team applies a resin base coat to the wood before laying the fiberglass.19:18 The construction includes installing support structures for the cabin floor and creating internal compartments, including a dedicated space for a shower water tank.22:53 The team uses a plane to adjust angles for the bulkhead fit and reinforces high-load areas with thicker timber.10:54 Despite the challenges of working in confined spaces and managing significant wood dust, the cabin layout now includes a functional wardrobe and bed frame.24:29 The project remains ongoing, with future tasks including the installation of doors, benches, and additional shelving.23:30

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema