Entre Terras e Maresvideo
WE COMPLETED THE BED AND CABINET STRUCTURE FOR THE BOW CABIN T1 ep158
16 March 2025 · 25 min · 419 views
What this video covers
Edgar and Sâmia continue the interior refit of the forward cabin, focusing on the structural framing for a bed and storage lockers.0:06 The process involves cutting and fitting wooden bulkheads, which are first joined with epoxy and then permanently laminated to the hull using polyester resin.5:23 To ensure a strong bond between the wood and the polyester-coated hull, the team applies a resin base coat to the wood before laying the fiberglass.19:18 The construction includes installing support structures for the cabin floor and creating internal compartments, including a dedicated space for a shower water tank.22:53 The team uses a plane to adjust angles for the bulkhead fit and reinforces high-load areas with thicker timber.10:54 Despite the challenges of working in confined spaces and managing significant wood dust, the cabin layout now includes a functional wardrobe and bed frame.24:29 The project remains ongoing, with future tasks including the installation of doors, benches, and additional shelving.23:30
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



