Entre Terras e Maresvidéo
WE COMPLETED THE BED AND CABINET STRUCTURE FOR THE BOW CABIN T1 ep158
16 mars 2025 · 25 min · 419 vues
Ce que couvre cette vidéo
Edgar and Sâmia continue the interior refit of the forward cabin, focusing on the structural framing for a bed and storage lockers.0:06 The process involves cutting and fitting wooden bulkheads, which are first joined with epoxy and then permanently laminated to the hull using polyester resin.5:23 To ensure a strong bond between the wood and the polyester-coated hull, the team applies a resin base coat to the wood before laying the fiberglass.19:18 The construction includes installing support structures for the cabin floor and creating internal compartments, including a dedicated space for a shower water tank.22:53 The team uses a plane to adjust angles for the bulkhead fit and reinforces high-load areas with thicker timber.10:54 Despite the challenges of working in confined spaces and managing significant wood dust, the cabin layout now includes a functional wardrobe and bed frame.24:29 The project remains ongoing, with future tasks including the installation of doors, benches, and additional shelving.23:30
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



