Entre Terras e Maresvídeo

WE COMPLETED THE BED AND CABINET STRUCTURE FOR THE BOW CABIN T1 ep158

16 de março de 2025 · 25 min · 419 visualizações

O que este vídeo aborda

Edgar and Sâmia continue the interior refit of the forward cabin, focusing on the structural framing for a bed and storage lockers.0:06 The process involves cutting and fitting wooden bulkheads, which are first joined with epoxy and then permanently laminated to the hull using polyester resin.5:23 To ensure a strong bond between the wood and the polyester-coated hull, the team applies a resin base coat to the wood before laying the fiberglass.19:18 The construction includes installing support structures for the cabin floor and creating internal compartments, including a dedicated space for a shower water tank.22:53 The team uses a plane to adjust angles for the bulkhead fit and reinforces high-load areas with thicker timber.10:54 Despite the challenges of working in confined spaces and managing significant wood dust, the cabin layout now includes a functional wardrobe and bed frame.24:29 The project remains ongoing, with future tasks including the installation of doors, benches, and additional shelving.23:30

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026This week the focus was on something else06/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema