Entre Terras e Maresvideo

ep 149 s1 kitchen backsplash

12 gennaio 2025 · 16 min · 380 visualizzazioni

Cosa tratta questo video

Edgar and Sâmia continue the interior fit-out of their boat, focusing on the galley cabinetry and the application of beige and wood-grain formica.0:09 The project required modifying a drawer unit after Edgar realized the original design blocked the routing for hot and cold water lines.1:49 After cutting down the drawer size to accommodate the plumbing, the team successfully installed the lines leading to the sink area.2:03 The finishing process involves applying contact adhesive to both the substrate and the formica edge banding, waiting 15 minutes for the glue to tack, and using a heat gun to mold the material around curves.5:13 The galley layout includes dedicated spaces for a stove and oven, with plans to install green marble-patterned formica on the countertop.14:02 The crew works through the night to complete the lower cabinetry, aiming to finish the interior construction to meet their goal of launching the vessel in 2025.9:31

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema