Entre Terras e Maresvideo

ep 149 s1 kitchen backsplash

January 12, 2025 · 16 min · 380 views

What this video covers

Edgar and Sâmia continue the interior fit-out of their boat, focusing on the galley cabinetry and the application of beige and wood-grain formica.0:09 The project required modifying a drawer unit after Edgar realized the original design blocked the routing for hot and cold water lines.1:49 After cutting down the drawer size to accommodate the plumbing, the team successfully installed the lines leading to the sink area.2:03 The finishing process involves applying contact adhesive to both the substrate and the formica edge banding, waiting 15 minutes for the glue to tack, and using a heat gun to mold the material around curves.5:13 The galley layout includes dedicated spaces for a stove and oven, with plans to install green marble-patterned formica on the countertop.14:02 The crew works through the night to complete the lower cabinetry, aiming to finish the interior construction to meet their goal of launching the vessel in 2025.9:31

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue