Entre Terras e Maresvidéo

ep 149 s1 kitchen backsplash

12 janvier 2025 · 16 min · 380 vues

Ce que couvre cette vidéo

Edgar and Sâmia continue the interior fit-out of their boat, focusing on the galley cabinetry and the application of beige and wood-grain formica.0:09 The project required modifying a drawer unit after Edgar realized the original design blocked the routing for hot and cold water lines.1:49 After cutting down the drawer size to accommodate the plumbing, the team successfully installed the lines leading to the sink area.2:03 The finishing process involves applying contact adhesive to both the substrate and the formica edge banding, waiting 15 minutes for the glue to tack, and using a heat gun to mold the material around curves.5:13 The galley layout includes dedicated spaces for a stove and oven, with plans to install green marble-patterned formica on the countertop.14:02 The crew works through the night to complete the lower cabinetry, aiming to finish the interior construction to meet their goal of launching the vessel in 2025.9:31

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème