Sven Yrvindvideo

2 Masts down, ready for the trailer.

8 settembre 2026 · 2 min · 5K visualizzazioni

Cosa tratta questo video

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Guarda su YouTube

Altro da Sven Yrvind

Back to Work.set 2026A Non Bloated Boat in a Bloated World.set 2026No access to boat sat and sunday.set 2026Fixing water collection and trailer adaption.set 2026

Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema