Epiphany Sailingvideo
Hanging Dinghy and patching bottom leak
20 novembre 2025 · 15 min · 76 visualizzazioni · Stocking Island
Cosa tratta questo video
A C&C Yachts 39 owner repairs tears in an aluminum-floor dinghy while at anchor in the Bahamas. The floor leaks due to abrasion against the aluminum ribs caused by beaching and davit contact.1:31 The repair involves wire-brushing the damaged areas, applying 3M 5200 adhesive sealant between the floor and aluminum, and covering the tears with thick rubber patches reinforced by fiberglass matting.5:32 When 3M 5200 supplies run low, the owner supplements the repair with E6000 adhesive and a multi-purpose cement.9:47 The dinghy remains hoisted on the davits during the process to allow access from the swim platform.2:36 After an hour of curing, the dinghy is lowered and remains dry.11:54 To prevent future damage, the owner secures the dinghy with a three-point system consisting of two ropes and a chain to minimize movement against the davits.14:50 The owner also notes the process for ordering marine supplies to the Bahamas via Amazon and DHL.10:00
Barche in questo video
Altro da Epiphany Sailing
Da Epiphany Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



