BoatworksTodayvideo
Building The Fiberglass Mold For The Aft Deck Cover #Bertram25
20 luglio 2025 · 26 min · 10K visualizzazioni
Cosa tratta questo video
Andy constructs a makeshift mold to cast a fiberglass aft deck cover for a Bertram 25.▶ 0:30 The project requires a rigid frame that accounts for the deck's five-foot width and three-foot depth.▶ 2:27 To ensure the final lid fits with approximately one-quarter inch of clearance on all sides, Andy installs half-inch spacers around the perimeter of the existing deck opening.▶ 1:00 He secures a frame around these spacers to establish the outer dimensions of the mold.▶ 1:21 After shimming the corners to maintain stability, he attaches a flat sheet of OSB to serve as the base for the casting surface.▶ 17:44 This approach aims to create a stable, non-binding lid that avoids the need for a central support structure across the wide span.▶ 2:27 The process involves precise cutting and fitting to ensure the mold remains square and properly oriented before the fiberglass layup begins.
Altro da BoatworksToday
Da BoatworksToday — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



