BoatworksTodayvideo
Building the fibreglass mould for the aft deck cover #Bertram25
20 July 2025 · 26 min · 11K views
What this video covers
Andy constructs a makeshift mould to cast a fibreglass aft deck cover for a Bertram 25.0:30 The project requires a rigid frame that accounts for the deck's five-foot width and three-foot depth.2:27 To ensure the final lid fits with approximately one-quarter inch of clearance on all sides, Andy installs half-inch spacers around the perimeter of the existing deck opening.1:00 He secures a frame around these spacers to establish the outer dimensions of the mould.1:21 After shimming the corners to maintain stability, he attaches a flat sheet of OSB to serve as the base for the casting surface.17:44 This approach aims to create a stable, non-binding lid that avoids the need for a central support structure across the wide span.2:27 The process involves precise cutting and fitting to ensure the mould remains square and properly oriented before the fibreglass layup begins.
More from BoatworksToday
From BoatworksToday — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



