BoatworksTodayvidéo
Building The Fiberglass Mold For The Aft Deck Cover #Bertram25
20 juillet 2025 · 26 min · 10K vues
Ce que couvre cette vidéo
Andy constructs a makeshift mold to cast a fiberglass aft deck cover for a Bertram 25.▶ 0:30 The project requires a rigid frame that accounts for the deck's five-foot width and three-foot depth.▶ 2:27 To ensure the final lid fits with approximately one-quarter inch of clearance on all sides, Andy installs half-inch spacers around the perimeter of the existing deck opening.▶ 1:00 He secures a frame around these spacers to establish the outer dimensions of the mold.▶ 1:21 After shimming the corners to maintain stability, he attaches a flat sheet of OSB to serve as the base for the casting surface.▶ 17:44 This approach aims to create a stable, non-binding lid that avoids the need for a central support structure across the wide span.▶ 2:27 The process involves precise cutting and fitting to ensure the mold remains square and properly oriented before the fiberglass layup begins.
Plus de vidéos de BoatworksToday
De BoatworksToday — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



